The quietest margin losses are not in linehaul. They are in audit and exception recovery.
Everybody watches the linehaul rate, the fuel table and the deadhead miles. Nobody watches the detention charge that never became a billable line, or the accessorial a carrier billed you twice. It never shows up as a loss. It shows up as margin that was never there.
A finance-looking problem with an engineering root. Three mechanics, all fixable.
What changes
When the leak is process, not code
Ask AP what share of variances they actually file.
If they know the number, it is high, and disputes are won but slowly — your constraint is capacity, not software. Engineering is the expensive way to solve that.
Check whether your rate cards are digitized.
If the contracts are PDFs in a shared drive and nobody has structured the accessorial schedules, the first job is contract normalization — a data project, and we are an expensive way to do data entry.
Read what the contract entitles you to.
If the tariff says the charge is valid, no software recovers it. Automation finds errors; it does not renegotiate deals you already signed.
The gap we will not paper over:
We have no case in cross-border duty calculation, claims automation or parcel rate optimization. Our customs-adjacent work (C11) is document checks at a container terminal, not duty. If that is where your money goes, we would be learning on your budget — the exact arrangement this page argues against.
How we start — the two-week margin reconciliation.
$7,500. Fixed scope. Two weeks. Run against 90 days of your own invoice data — not a benchmark, not an industry average. Yours. What we hand back: the size of the leak in dollars, with the evidence line by line. The split between under-billing customers and over-paying carriers — two different fixes. The variance bands you write off and what they add up to over a year. And the recovery available without renegotiating a single carrier contract. For scale, not as a promise: the improvement at the broker in C06 was $59,000 a month — the distance between $8,000 recovered before and $67,000 after. Two weeks is how you find out what your number is. If you are not sure where the problem is, start here. Nothing after it is required.
- 0190 days of carrier invoices however they arrive — PDF, EDI 210, portal export
- 02The contracted rate cards and accessorial schedules that govern them
- 03Last quarter's write-off report
- 04Read access to the operational events behind the loads: 214s, PODs, appointment records