Two weeks. $7,500. You keep the findings whether or not you keep us.

A fixed-scope engineering diagnostic of the systems that move your freight and your invoices. Ten working days. We instrument what is already running, watch it through a peak window, re-price ninety days of your own carrier invoices, check what your AI costs and returns, and rank every failure by what it costs you per month — evidence attached to each line.

If you are not sure where the problem is, start here. Nothing after it is required.

01Duration10 working days
02Price$7,500 · fixed scope
03What you keepFindings document + evidence pack
04AfterNo follow-on obligation

What a call can and cannot do

Usually in the length of the sales process, and in a scope written to be won rather than to be right.

Take the free call if the question is whether we know the domain — thirty minutes, an engineer, bring the thing that is broken. What a call cannot do is tell you where the money is going. That needs read access to production data and two weeks of somebody’s full attention.

Few firms in this space publish a price for discovery. We publish one fixed number because a scoped engagement should be budgetable before the sales call: $7,500.

The price is also the filter, and it cuts both ways. It earns us the right to ask for a read replica and your carrier contracts on day one, and it means we spend the ten days on companies that intend to act on the answer.

For scaleOne four-hour peak failure
$80,000–$120,000

in SLA penalties, when the window is missed once.

C09 · 3PL hub, 35,000 shipments a day

Ten working days, five phases. Here is all of it.

Published in full, because the ask is the revealing part. If this is more access than you would give a vendor in week one, better to know before either of us signs. NDA and access safeguards are agreed in the scope before work starts.

Phase 01 · Days 1–2Intake

What we ask you for, named, so you can check whether you have it.

  • 01Ninety days of carrier invoices as they actually arrive — PDF, EDI 210, portal export. Not a cleaned extract. The mess is the data.
  • 02Rate cards and accessorial schedules for your top carriers, with the contracts behind them: base rate, fuel surcharge formula, detention, residential, reweigh, reconsignment.
  • 03Ninety days of EDI logs — 850, 856, 810, 940, 945, and the 997 acknowledgments, including the rejections nobody read.
  • 04A read replica or restored snapshot of the operational database, plus read-only monitoring access if monitoring exists.
  • 05Twelve months of incident history — tickets, pages, post-mortems, or the channel where nights get handled when there are none.
  • 06A named peak window in the next two weeks: the shift, the day, or the promotion you expect to hurt.
  • 07Two hours with whoever built the integration layer, one with your AP lead, one with whoever carries the pager.
Out of it — A scope boundary you approve on day two, plus a data-completeness note — anything on the list that does not exist becomes a finding now rather than a surprise in week two
Phase 02 · Days 3–4Instrumentation

We measure the systems at normal volume, so the peak run has something to be compared against.

  • 01Timing on order ingest, carrier rate calls and EDI dispatch — lightweight tracing where it can be added without a deploy, log-derived timings where it cannot.
  • 02Carrier API latency and error rate per carrier, p50 and p95. One carrier changing an endpoint took a client's rating flow down for three weeks (C01); we look for the same failure waiting in yours.
  • 03The database as it is: slowest twenty queries by total time, bloat, partitioning, what VACUUM costs and what it competes with. At one fulfillment platform VACUUM ran for more than six hours on a 3.2-billion-row orders table, competing with production writes (C08).
  • 04EDI and ASN health: 997 acknowledgment rate, timeouts, rejections that surfaced to nobody, and transmitted 856 carton records against what physically shipped — a gap of about 4% at a non-asset 3PL with major US retail accounts (C05).
Out of it — A baseline: what your systems do on an ordinary Tuesday, in numbers
Phase 03 · Days 5–6The peak run

We watch the window you named, live — your volume, your SKU mix, your carriers, your staffing on that shift, not a synthetic benchmark.

  • 01Queue depth and where it builds; latency in the worst hour rather than the average; cutoff proximity; where retry storms start; which manual workaround the floor reaches for.
  • 02Warehouse software rarely errors at peak. It gets slower, and operations absorbs the difference in overtime.
Out of it — A peak-window trace: what degraded, in what order, how close it came to a missed cutoff
Phase 04 · Days 7–8The money pass

We rebuild the invoice arithmetic ourselves, line by line, against your own contracted rate card. Ninety days, both directions.

  • 01What carriers overbilled you — variance by carrier, lane, accessorial code and dollar band, including under $50, where the money usually is. At one LTL broker a manual dispute took 45 minutes to build, so anything under $50 went unchallenged — at 12,000 invoices a month, that was thousands of variances (C06).
  • 02What you delivered and never billed. The quieter half. Retroactive accessorial reconciliation and unbilled services ran $45,000 a month at one non-asset 3PL (C01).
  • 03Whether each line traces back to the operational event behind it. Where it does not, the missing trace is the finding.
Out of it — A reconciliation ledger: your ninety days re-priced, with a total and a per-line trail
Phase 05 · Days 9–10Ranking and handover

Every finding gets a monthly cost, a confidence level, its evidence, and effort in engineer-weeks. Ranked by annualized cost, not by technical severity and not by what we would enjoy building.

  • 01Where a finding is a day of work for an engineer who already knows your codebase, we mark it yours.
  • 02Handover is a two-hour walkthrough with engineering leadership, and a session with finance when the leak sits on the invoice side. The document is delivered, not presented and taken away.
Out of it — The ranked list, and the total the diagnostic exists to produce

What you get

01The findings document
Every failure we found, written for an engineer: what breaks, under what conditions, what it costs per month, how sure we are. HTML and markdown, not a deck.
02The ranked failure list
One row per finding: monthly cost · confidence · engineer-weeks · who should fix it. It has a total at the bottom, and that total is the number the diagnostic exists to produce.
03The evidence pack
Queries, scripts, traces, invoice diffs, sample transactions. Your team can re-run every claim without us in the room. The ranking should be arguable.
04The one-page money view
The same ranking in dollars, no engineering vocabulary, for whoever approves the budget.

Scope limits, stated now rather than discovered in week two.

Limit 01Out of scope

It will not fix anything.

Ten days buys measurement. Nothing we touch changes state. Construction is a different contract and we will price it.

Limit 02Out of scope

It will not renegotiate your carrier contracts.

We read them to price the variance and hand you the clause each dispute stands on. We are not a freight-audit brokerage and take no percentage of recovery.

Limit 03Out of scope

It will not stand in for SOC 2 or ISO 27001.

We hold neither certification. The document flags security issues we trip over; it is not an audit and we will not let it be read as one.

Limit 04Out of scope

It will not tell you your WMS vendor is wrong.

Where the fault sits inside a licensed product we say so, show the evidence, and give you reproduction steps to take to the vendor.

Limit 05Out of scope

It will not price a rebuild to the dollar.

Effort comes back in engineer-weeks with a range that narrows after the first month of real work. A precise number in week two is a proposal, not an estimate.

Limit 06Out of scope

It is not an assessment of your people.

We look at systems and evidence. When the constraint is plainly organizational — as at the 3PL where the CTO was personally closing night incidents at 45 to 90 minutes each (C09) — we say it once, and go back to the code.

What happens next

Three doors. All three are normal.

Door 01Continue with us
Scope comes off the ranked list, top down. Two weeks from signature to first commit, with squad compositions and pricing published on how we work. The fee bought the two weeks; nothing in it obligates a second contract.
Door 02Act with your own team
The evidence pack is reproducible on purpose; some findings are one engineer and a day. At the mid-market 3PL in C10 the most durable output was not code — it was the rule that no AI initiative starts without success metrics, an ROI estimate and a named owner. That rule outlived the engagement.
Door 03Do nothing
The ranked list has a total. If the total is small, the honest reading is that your systems are healthier than the last vendor implied. You know that in ten days for a fixed fee, instead of six months into a build.

One week-one saving, and one build that recovered $59,000 more per month

EXH. C10Mid-market 3PL · AI spend

Eight months into AI, not one model in production, spend with no owner. In the first week we turned off LLM API calls running from staging into integrations nobody used. Two vendors selling “AI features” turned out to be regex underneath. Monthly AI spend went $42,500 → $16,000, down 62% with no working initiative lost, and the first priority use case — automatic carrier invoice classification — was in production nine weeks later.

$14,000/month saved in the first week
EXH. C06US freight broker · audit recovery

LTL, ~12,000 carrier invoices a month, eight carriers with eight rate structures, four people normalizing them by hand in Excel against 30% annual volume growth. Every variance under $50 written off unchallenged, because building one dispute took 45 minutes. The completed audit pipeline increased monthly recovery by $59,000, using invoices the client already held — and the AP team absorbed 40% volume growth without adding a person.

$8,000 → $67,000 a month · threshold $50 → $5

Questions people actually ask

01Who owns the findings document?
You receive the findings document and evidence pack on delivery, and you are free to act on it with anyone. The signed agreement governs data retention and reuse.
02What data do you need from us?
The full list is in the agenda — invoices, rate cards, EDI logs, a read replica, incident history, a peak window. Customer names can be hashed before anything leaves your network; rates, volumes and timestamps cannot, because they are what we measure.
03What if you find nothing?
Before you sign we check whether the data exists to measure anything, and if it does not we say so and do not take the engagement. If the ranked total still comes back small, the document says so in its first paragraph — you get a measured baseline and a defensible answer for the next person who says the platform is on fire. Cheaper at $7,500 than at month six of a rebuild.
04Can we stop after?
Yes. The diagnostic ends at handover; any further work starts under a separate agreement. If you are not sure where the problem is, start here. Nothing after it is required.
05Who is on the team?
A solution architect plus a specialist matched to what is breaking — a data engineer for the money pass, a database engineer for the peak run, an SRE for the incident history. The technical lead you meet on the scoping call stays on the diagnostic through handover.
06How fast can you start?
We set the start date after the NDA and data handoff. The constraint is almost never us; it is how long your side takes to export ninety days of invoices and issue credentials. If your peak window matters, and it usually does, we build the ten days around it.

Start where the money is leaking.

Two weeks, $7,500, fixed scope. We instrument what you have, rank the failures by what they cost you, and hand you the findings document — yours to keep and to act on with us, with someone else, or with your own team.